All about Bangalore-Mysore Expressway

By
Rajat Piplewar

The Bangalore-Mysore Expressway: A Game-Changer for Karnataka’s Connectivity

On March 12, 2023, Prime Minister Narendra Modi inaugurated the Bangalore-Mysore Expressway. During the inauguration, he highlighted the importance of enhancing connectivity between these two key centers of technology and tradition. He emphasized that the expressway would serve as a catalyst for socio-economic development in the region. Continue reading to discover more about the Bangalore-Mysore Expressway and its significance.

Bangalore-Mysore Expressway: Overview

Bangalore and Mysore are two of Karnataka’s most important cities, known for their significance in business and tourism. Currently, the four-lane NH-275 is a key highway connecting these cities, but it is often congested as it passes through populated areas like Maddur, Mandya, and Srirangapatna. The proposed Bangalore-Mysore Expressway, part of the NH-275 Highway, aims to alleviate these issues by providing a direct route between Bangalore and Mysore, as well as linking Bangalore to Mangalore, Kodagu, and Kerala regions.

The expressway has been upgraded from a state highway to a national highway with 10 lanes. The Bangalore-Mysore Expressway project includes the six-lane of the Bangalore-Nidaghatta-Mysore section of NH-275. Spanning 118 km, the expressway will significantly reduce travel time between Bangalore and Mysore from approximately three hours to about 90 minutes. The project features a mix of brownfield upgrades (60%) and greenfield developments (40%) and was proposed as an alternative to the canceled NICE (Nandi Infrastructure Corridor Enterprises) Road.

Constructed in two phases with an investment of around Rs 8,066 Cr, the expressway includes a 51-km-long bypass road to avoid towns along the current route. This bypass will be fenced on both sides, enhancing safety and efficiency. The project is being developed under the Bharatmala Pariyojana (BMP) initiative.

Bangalore-Mysore Expressway: Key Facts

| Name | Bangalore–Mysore Expressway or National Highway-275 (NH-275) | | Status | Operational | | Type | Access-controlled expressway | | Cost | Rs 8,066 Cr | | Length | 118 km | | Travel time | 90 minutes | | Lanes | Six (to be expanded to 10) | | Inaugurated in | March 2023 |

Bangalore-Mysore Expressway: Route

The Bangalore-Mysore Expressway will feature 49 underpasses, 69 bus bays, 13 overpasses, and fencing on both sides of the access-controlled, six-lane road to ensure a smooth and uninterrupted journey. This expressway will also include a greenfield bypass. The bypasses will cover various sections: a 22 km stretch for Ramanagaram and Channapatana combined, an 8 km stretch for Mandya, a 10 km stretch for Srirangapatana, a 4 km stretch for Maddur, and a 7 km stretch for Bidadi. These bypasses will allow commuters to avoid all these major towns, providing a direct and efficient route between Bangalore and Mysore.

Bangalore-Mysore Expressway: Timeline

| Date | Particulars | | March 2018 | Foundation stone was laid | | April 2018 | Construction contract was awarded to Dilip Buildcon for Phase 1 | | March 2019 | Construction work was stalled because of land acquisition problems | | April 2019 | Land acquisition began | | May 2019 | Work on Phase 1 began | | December 2019 | Work on Phase 2 started | | 2020 | Work was delayed due to COVID-19 | | December 2021 | Phase 1 completed up to 83% and Phase 2 up to 73% | | February 2023 | Bangalore-Mysore Expressway reached final stage | | March 2023 | PM Modi inaugurated the expressway |

Bangalore-Mysore Expressway: Phases

The expressway shortening the distance between Bangalore and Mysore is developed in two phases simultaneously. In addition to four ROBs (railway overbridges), the expressway will feature 19 large bridges, 44 small bridges, and 44 micro bridges. It will also include 50 underpasses for pedestrians and vehicles.

Phase 1

The first phase connects Bangalore to Nidaghatta, starting from Panchamukhi Ganapathi Temple on NICE Road. This phase, spanning approximately 56.2 km, will cost a total of Rs 3,900 Cr, with Rs 1,600 Cr allocated for land acquisition.

Phase 2

The second phase extends from Nidaghatta to Mysore. Covering a road length of 61.1 km, this phase is estimated to cost around Rs 3,600 Cr, including Rs 1,200 Cr for land acquisition.

Bangalore-Mysore Expressway: Toll Rates in 2024

Starting from April 1, 2024, the Bengaluru-Mysuru Expressway toll rates have been updated as follows:

  • For the trip between Nidaghatta and Mysore, the toll charges are now Rs 160 for a single journey and Rs 240 for a round trip for cars, vans, and jeeps.
  • For vehicles traveling on the Bangalore-Nidaghatta segment, the toll fee is Rs 170 for a one-way trip and Rs 255 for a round trip, effective April 12.
  • Beginning July 1, car users will be charged Rs 320 for a single journey and Rs 485 for a round trip on the Bangalore-Mysore Expressway.
  • Toll rates for the journey between Nidaghatta and Mysore remain at Rs 160 for a single trip and Rs 240 for cars, vans, and jeeps.

These updated toll charges reflect recent adjustments made on the Bangalore-Mysore Expressway.

Bangalore-Mysore Expressway: Features

Some of the key features of this expressway include:

Grade-separated interchanges: Strategically planned interchanges reduce the need for red lights, enhancing traffic flow, and safety.

Multi-lane design: The expressway features multiple lanes to accommodate high traffic volumes and minimize congestion.

Strong roadside barriers: These barriers are designed to prevent vehicles from leaving their lanes, enhancing overall safety.

Clear signage and markings: Well-marked lanes and prominent signage help reduce driver confusion and improve navigation.

Emergency response systems: A robust system is in place to handle unforeseen situations, ensuring quick and effective responses to emergencies.

Bangalore-Mysore Expressway: Benefits

Reduced travel time: Covers the Bangalore to Mysore distance within 90 minutes instead of three hours.

Decreased traffic congestion: The construction of 59 overpasses and underpasses will lessen traffic congestion and enhance road safety.

Economic growth: Amplifies the national economy, improves connectivity, and reduces pollution.

Attracts investment: Will draw investors to the city, fostering economic opportunities.

Accelerated development: Speeds up the city’s development and growth, adding value and increasing urbanization.

Real estate boost: The expressway will be highly beneficial for the real estate sector.

Bangalore-Mysore Expressway: Real Estate Impact

The Bangalore-Mysore Expressway is set to revolutionize travel between Karnataka’s two largest cities, reducing the journey time to just one hour and 30 minutes, comparable to renowned projects like the Golden Quadrilateral and Svarnim Chaturbhuj. This development is poised to stimulate growth in surrounding villages and towns, enhancing civic, and economic infrastructure. Notable cities along the route include Bidadi, Ramanagara, Mandya, Channapatna, Maddur, and Srirangapatna, which are expected to experience accelerated development in both business and residential sectors.

Mysore’s emergence as a fast-growing tech hub, second only to Bangalore, further fuels expectations of a real estate boom along the Bangalore-Mysore Expressway. The allure of residing close to both IT cities is expected to attract people to the area, driving demand for nearby properties. Additionally, the rapid growth of Bangalore’s North and East neighborhoods, coupled with improved connectivity to Mysore, is poised to foster further corporate expansion and development in these regions. These factors collectively indicate a significant boost to the expansion and development of the real estate market in the Bangalore-Mysore Expressway region.

Conclusion

The Bangalore-Mysore Expressway stands as a monumental achievement in enhancing connectivity and fostering socio-economic development between two pivotal cities in Karnataka. Inaugurated by Prime Minister Narendra Modi on March 12, 2023, this expressway has been a long-awaited solution to alleviate traffic congestion and provide a more efficient travel route. Its upgrade from state highway to national highway with 10 lanes signifies a significant investment in infrastructure and regional connectivity. The project’s timeline, development phases, and key features highlight the meticulous planning and execution involved in its construction. With reduced travel time, improved safety measures, and enhanced traffic flow, the expressway is poised to bring about a multitude of benefits, including economic growth, investment attraction, and accelerated urban development. Furthermore, the real estate impact of the Bangalore-Mysore Expressway is expected to be profound, with surrounding areas experiencing rapid growth and heightened demand for properties.

FAQs

Got any questions or point of view on our article? We would love to hear from you. Write to our Editor-in-Chief Rajat Piplewar at rajat@bhume.in

FAQ