Bangalore Metro map, upcoming stations, timings and fare

By
Rajat Piplewar

Bangalore Metro: A Comprehensive Guide to Connectivity

Bangalore, the bustling IT hub of India, was the first city in southern India to introduce metro rail connectivity. The Bangalore Metro, also known as Namma Metro, has significantly transformed the city’s transportation landscape. Let’s dive into the details of this extensive metro network, its current status, and future plans.

The Inception of Bangalore Metro

When the Bengaluru Metro was inaugurated, it marked the beginning of the first underground metro system in South India. The network comprises underground, at-grade, and elevated metro stations, managed by the Bengaluru Metro Rail Corporation Limited (BMRCL). This joint venture between the Government of India and the Karnataka government is responsible for building, operating, and expanding the metro network in Bangalore.

Recent Developments

On October 9, 2023, BMRCL opened the Namma Metro’s 43-km Purple Line, connecting Challaghatta to Kadugodi (Whitefield). This new section, which includes 37 stations, bridges the gap between the eastern and western parts of the city, taking around 80 minutes to cover the total distance.

Major Expansion Plans

Bangalore Metro is set to witness a significant expansion with a proposed 129-km addition under Phase-4. This expansion aims to enhance connectivity in suburban areas, addressing the lack of sufficient metro links in the city’s core regions.

Proposed New Corridors

According to a Times Now report, the BMRCL has obtained state government approval to conduct feasibility studies for five additional metro corridors:

  • Challaghatta to Bidadi (15 km)
  • Silk Institute to Harohalli on Kanakapura Road (24 km)
  • Madavara to Kunigal Cross near Nelamangala (11 km)
  • Bommasandra to Attibele (11 km)
  • Kalena Agrahara to Kadugodi Tree Park via Jigani Attibele and Varthur (68 km)

New Metro Lines and Extensions

The BMRCL’s new plan includes a new metro line and extensions of the existing Purple and Green lines in four directions: Bidadi (Mysuru Road), Harohalli (Kanakapura Road), Attibele (Hosur Road), and Kunigal Cross (Tumakuru Road, near Nelamangala). The proposed new semicircular line will connect localities such as Jigani, Anekal, Attibele, Sarjapur, and Varthur, focusing on the city’s east and south.

Namma Metro Phase 3

Work on Namma Metro Phase 3 is expected to begin this year, comprising three metro corridors with a total length of 81.12 km. The Metro 3A project has received approval from the state finance department, and BMRCL will soon begin land acquisition work.

Geotechnical Investigations

BMRCL has announced the commencement of geotechnical investigations for the upcoming phase, valued at Rs 6 crore. The addition of two new elevated metro lines covering 45 kilometers is expected to boost connectivity across the city.

Upcoming Metro Stations in Bangalore

New Routes on Namma Metro

LineTerminalsExpected work completion date
Purple LineChallaghatta – WhitefieldOctober 2023
Green LineNagasandra – Madavara (previously BIEC)January 2022
Yellow LineRashtreeya Vidyalaya Road – BommasandraMarch 2022
Pink LineKalena Agrahara (previously Gottigere) – NagawaraJune 2024
Blue LineCentral Silk Board – KR PuramJune 2026
Blue LineKR Puram – Kempegowda International AirportJune 2026

Future Metro Corridors

According to an action plan prepared by the Karnataka department of planning, program monitoring, and statistics, and the Federation of Indian Chambers of Commerce & Industries (FICCI), the Karnataka government plans to introduce four new Metro corridors by 2032 under Phase 3 of the Bangalore Metro Rail project. The proposed new metro lines are expected to provide Metro access to every citizen within 1-2 km from their workplaces or homes.

Proposed Metro Corridors

Developed at the cost of Rs 27,000 crore, the proposed Metro corridors include:

  • Old Airport Road, from MG Road to Hope Farm via Marathahalli and Whitefield/ IT corridor (underground), covering 16 km, with an estimated cost of Rs 9,600 crore
  • Nagawara to Kempegowda International Airport (KIA) via Thanisandra/ Bharatiya City, covering 25 km, with an estimated cost of Rs 10,000 crore
  • A 6-km Metro extension from Whitefield to Katamanallur / Hoskote, at an estimated cost of Rs 2,400 crore
  • A 12-km extension of Bannerghatta line to Jigani at an estimated cost of Rs 4,800 crore

Other Proposed Lines in Bangalore

LineTerminals
Purple line extensionWhitefield – Hoskote (6 km)
Pink line extension northwardsNagawara – KIAL Terminals via Thanisandra 25 km
Pink line extension southwardsKalena Agrahara – Jigani 12 km
Yellow line extension along Hosur roadBommasandra – Hosur

Operational Metro Routes in Bangalore

Metro lineRouteDistanceStations
Line-1 Purple LineChallaghatta – Whitefield (Kadugodi)42.17 km37
Line-2 Green LineNagasandra – Silk Institute30 km29

Namma Metro Construction

The Bangalore Metro was designed and conceptualized by the Delhi Metro Rail Corporation (DMRC). The first line was opened to the public in October 2011, after years of delay. The project, currently in expansionary mode, is being executed by the Bengaluru Metro Rail Corporation Limited (BMRCL). The average daily ridership on the Namma Metro network is 5,18,000 as per data last updated in January 2020.

Namma Metro Phase 1

Bangalore’s Namma Metro Phase 1 included two lines of length of 42 kms, of which about 8.82 kms is underground and the remaining is elevated. There are 40 stations in this phase. The foundation stone for construction of Phase 1 was laid in June 2006 and the construction began between Baiyyappanahalli and Mahatma Gandhi Road in April 2007. The phase was later expanded to include the northern extension (from Yeshwanthpur to Nagasandra) and southern extension (from Rashtreeya Vidyalaya Road to Yelachenahalli).

Cost

The final cost for developing Namma Metro Phase 1 was estimated to be Rs 14,405 crore while the land acquisition is around Rs 2,500 crore.

Namma Metro Phase 2

Approved in January 2014 by the union cabinet, the estimated cost for the second phase of Namma Metro was Rs 26,405 crores, which is estimated to escalate to Rs 32,000 crores in due time. Phase 2 spans a length of 72 kms, out of which 13 kms is underground. This phase has 62 stations out of which 12 are underground. Bengaluru Metro Phase 2 includes extension of the two Phase 1 lines in both directions, as well as construction of two new lines.

Key Extensions

  • The south-end of the Green Line will be extended from Yelachenahalli to Anjanapura along Kanakapura Road and from Nagasandra to Madavara (previously named BIEC) on Tumkur Road.
  • On the Purple line, the east-end has been extended from Baiyappanahalli to Whitefield and from Mysore Road to Challaghatta via Kengeri.

RV Road to Bommasandra

A new, 18-km-long, fully-elevated line from RV Road in south Bangalore to Bommasandra in the southeast via Electronic City is also planned in the second phase. The metro line is expected to be operational by December 2023.

Kalena Agrahara (Gottigere) to Nagawara

Another 21-km-line from Kalena Agrahara (previously Gottigere) to Nagawara is also under process. The route will have an elevated corridor, covering a distance of 7.5 kms with six stations and an underground stretch of 13.76 kms from south ramp near Jayanagar Fire station to north ramp at Nagawara consisting of 12 underground stations.

Namma Metro Phase 2A (Blue Line)

A new line between Silk Board and KR Puram has been included in Phase 2 as Phase-2A of the project. This line would run along the Outer Ring Road and is proposed to have 13 stations – Silk Board, HSR Layout, Agara, Ibbalur, Bellandur, Kadubeesanahalli, Kodibisanahalli, Marathahalli, ISRO, Doddanekundi, DRDO Sports Complex, Sarasvathi Nagara (previously Mahadevapura) and KR Puram.

Namma Metro Phase 2B (Airport Line)

To connect Kempegowda International Airport with MG Road, Namma Metro Phase 2B is under-construction, which will be built at a cost of Rs 10,584 crores. The route will be 39 kms long. The route would begin at Krishnarajapura (KR Puram) and will be aligned along the northern part of ORR (Outer Ring Road), via Nagawara, Hebbal and Jakkur, before heading towards the airport.

Namma Metro - Getting Around BangaloreImage Credit: http://bit.ly/23WGhCp

Cost

The total cost of Phase 2 is estimated around Rs 26,405 crore. Land acquisition is expected to cost around Rs 5,000 crore. The state and central governments will contribute 30% and 20% of the total project cost, respectively. The remaining will be obtained through senior term loans.

Namma Metro Phase 3

In March 18, 2024, the Karnataka cabinet gave a nod for the commencement of construction work for Bangalore Metro Phase 3. The Bangalore Metro Phase 3 project, which will be developed at an estimated cost of Rs 15,611 crore, is expected to be completed by 2028. Bangalore Metro Phase 3, which will cover a distance of 44.65 km, will come up along the entire stretch of the Outer Ring Road (ORR).

Proposed New Metro Routes

  • Carmelaram to Yelahanka, covering 37 kms
  • Marathahalli to Hosakerehalli, covering 21 kms
  • Bommasandra to Attibele
  • Gottigere to Basavanapura
  • RK Hegde Nagar to Aerospace Park
  • Kogilu Cross – Rajanukunte
  • Iblur to Carmelaram

Metrolite Lines

In 2020, the government announced that two corridors will be developed as metrolite lines, under public private partnership (PPP) model. These include ORR West Line of 30 kms: Hebbal to Mysore Road Metro Station and Magadi Road Toll Gate to Kadabagere section covering 14 kms.

Comprehensive Mobility Plan

In December 2019, the BMRCL introduced a Comprehensive Mobility Plan for subsequent phases. This includes the following routes under Phase 3:

  • Magadi Road Toll gate to Kadabgere (Metrolite) (12.5 km)
  • Hebbal to Sarjapura (35 km)

Hosahalli Metro Station

Hosahalli Metro Station (on Magadi road from Toll gate) to Kadabagere will be an elevated with nine metro stations. It is expected to be completed in 2028.

Cost

The estimated cost of the two corridors (J P Nagar to Kempapura and Hosahalli-Kadabagere) project is nearly Rs 13,500 crore. A new corridor of 35 km from Hebbal to Sarjapura will taken up under Phase-3B, estimated to cost around Rs 15,000 crore. The state government will bear 80 to 85% cost of the metro project. Around 13 to 15% is likely to be borne by the Centre.

Bangalore Metro Phase 4

New metro stations along the following routes will come up under Phase 4 as per the Comprehensive Mobility Plan:

  • JP Nagar to Hebbal Kempapura (32.15 km)
  • Whitefield to Domlur (31 km)
  • Inner Ring UG Metro (34 km)

According to media reports, the BMRCL has sought funds from the state government to conduct a feasibility study on the proposed metro lines under Namma Metro Phase 4.

Namma Metro Purple Line

The stretch from Mysuru Road to Kengeri became operational on August 30, 2021. The Purple Metro Line is a 42.5-km route connecting Challaghatta with Whitefield (Kadugodi), providing smooth connectivity between the eastern and western parts of the city. Mostly elevated, it has a 4.8-km underground section in the middle and passes through some of the prime areas of Bengaluru including MG Road, Majestic, Railway Station, Vidhana Soudha, etc. The journey from Challaghatta in the south-west and Kadugodi (Whitefield) in the east will take around 76 minutes.

Namma Metro Purple Line Stations

StationTransit / interchange
WhitefieldWhitefield railway station/Kadugodi Bus Stand
Channasandra
Kadugodi
Pattandur Agrahara
Sadaramangala
NallurhalliWhitefield TTMC
Kundalahalli
Sitharama Palya
Hoodi Junction
Garudacharpalya
Mahadevapura
KrishnarajapuramBlue Line (Planned, Ph-2A)/KR Puram Railway Station
Benniganahalli
BaiyappanahalliBaiyappanahalli Railway Station
Swami Vivekananda Road
Indiranagar
Halasuru
Trinity
MG RoadPink Line (UC)
Cubbon Park (Sri Chamarajendra Park)
Dr BR Ambedkar Station, Vidhana Soudha
Sir M Visvesvaraya Station
Nadaprabhu Kempegowda station, MajesticGreen Line/KG Bus Station City Railway Station
City Railway StationCity Railway Station
Magadi Road
Balagangadharanatha Swamiji Station, Hosahalli
Vijayanagara
AttiguppeVijayanagar TTMC
Deepanjali Nagara
Mysore RoadOrange Line(Planned, Phase lll)
Nayandahalli
Rajarajeshwari Nagara
JnanabharathiJnanabharathi
Pattanagere
MailasandraKengeri TTMC
Kengeri Bus Terminal
Challaghatta

Namma Metro Yellow Line

The Bangalore metro’s yellow line route will connect RV Road to Bommasandra along an elevated route, covering a distance of 19.14 kms. It will comprise a total of 16 metro stations. The BMRCL plans to open the Yellow Line, which connects RV Road to Bommasandra, in one go by December 2023.

Namma Metro Yellow Line Stations

Station Name
Rashtreeya Vidyalaya Road (RV Road)
Ragigudda
Jayadeva Hospital
BTM Layout
Central Silkboard
Bommanahalli (formerly HSR Layout)
Hongasandra (formerly Oxford College)
Kudlu Gate (formerly Muneshwara Nagar)
Singasandra (formerly Chikkabegur)
Hosa Road (formerly Basapura Road)
Beratena Agrahara (formerly Hosa Road)
Electronic City
Infosys Foundation Konappana Agrahara (formerly Electronic City – II)
Huskur Road
Hebbagodi (Hebbagodi Depot of 39.3 acres)
Bommasandra

Namma Metro Pink Line

The pink line is among the future metro projects in Bangalore that will boost the connectivity in the city. This section will span a distance of about 21 kms and connect Kalena Agaraha (formerly Gottigere) to Nagawara. There will be an elevated route of 7.5 kms and an underground stretch of 13.8 kms. There are a total number of 18 metro stations planned in this metro line.

Namma Metro Pink Line Stations

Station Name
Kalena Agrahara (formerly Gottigere)
Hulimavu
IIM-Bangalore
JP Nagar 4th Phase
Jayadeva Hospital
Swagath Road Cross
Dairy Circle
Lakkasandra (foremerly Mico Industries)
Langford Town
Rashtriya Military School (formerly Vellara Road)
MG Road
Shivaji Nagar
Cantonment
Pottery Town
Tannery Road
Venkateshpura
Kadugundanahalli (formerly Arabic College)
Nagawara

Once operational, the Pink Line metro route will connect key areas of the city and is expected to boost economic prospects in the region.

Namma Metro Green Line

The Bangalore Metro Green Line connects Nagasandra in the north-west to Anjanapura in the south-west. It covers a distance of 30 kms and has 30 stations. Like the Purple Line, this is also mostly elevated on both, the north and south sides and has a four-km underground section in the middle. The line has 26 elevated metro stations and three underground stations. Bangalore Metro Green Line passes through industrial areas such as Peenya, Yeshwanthpur in the north and connects it with the residential areas such as Basavanagudi, Jayanagar, Banashankari, etc. The Green Line is also being expanded till Madavara in the north-west and Silk Institute in the south. With this, the length of the line will increase to 33.5 kms.

Namma Metro Green Line Stations

| Station name

FAQ